Atlanta Public Safety Training Center Site Plans Hub – July 2022 Plans

With gratitute to the South River Watershed Alliance for helping to compile the open records requests that produced these site plans. These plans are current as of July 2022, dated to a re-submittial of the land development permit for the cop city project to DeKalb County. Due to the size and length of many of these documents, we have combined each section of the site plans and split them up among different posts. We hope this brings much-needed transparency, since the Atlanta Police Department, Atlanta Police Foundation, city of Atlanta, DeKalb County and their private funders have no interest in it. All PDFs, with the exception of the tree protection and replacement plans, are searchable.

Page 001-COVER Sheet of the APSTC site plans. Text is not intendeded to be readable here, just for illustration.

Cover Sheet, General Notes, Survey, Site Plans Grading Plans

Utility Plan, Profiles, Details

Erosion, Sedimention, and Pollution Control (ESPC) Notes, Phase I, II, II IV, and Details

Tree Protection Plan, Tree Replacement Plan, Charts, and Details

Intrenchment Creek Bridge and Stream Buffer Variance

Zoning Letter and Plat Boundary Line Adjustments

Hydrology Study

Enviornmental Site Assessment and Limited Site Investigation

Cultural Resource Assessments

Local, independent journalism takes time and resources. If you have the capacity, please consider becoming a subscriber or making a one-time contribution to keep ACPC running. Donate to ACPC here.

Leave a Reply